Project Gallery
Work across fabrication and fulfillment
A sample of production runs and logistics engagements — representative case studies built for this demo.
Northgate Foods Distribution
Structural Frames for Conveyor Retrofit
140 welded steel conveyor support frames, delivered in 3 production batches to keep the client’s line running during retrofit.
140
Units delivered
5 weeks
Lead time
100%
On-time delivery
Summit Aerospace Components
Tight-Tolerance Aluminum Brackets
5-axis CNC production run of 6,200 mounting brackets to ±0.001" tolerance with full dimensional reporting.
6,200
Units delivered
0.3%
Scrap rate
Full lot
AS9102 reports
Harborline Outdoor Goods
DTC Fulfillment Ramp-Up
Stood up dedicated DTC fulfillment inside 30 days, scaling from 200 to 4,000 orders/day during peak season.
4,000
Peak orders/day
30 days
Ramp-up time
99.8%
Order accuracy
Westline Building Supply
Regional Distribution Network Redesign
Reworked a single-hub model into a 3-node cross-dock network, cutting average delivery time by 38%.
38%
Transit time reduction
3
Regional hubs
19%
Freight cost savings
No projects match your search or filter.